Project Portfolio

Eagle Drive
Whistler, BC

General Contractor: Kits Construction
Designer: Form Collective
Project Completion Date: 2023

Three-bedroom townhouse renovation in Whistler Cay Heights.

Upgraded to new LED recessed lighting throughout the entire unit.

Enhanced with LED strips installed under cabinets, vanities, and behind the powder room mirror

Modernized with Lutron lighting control system installed throughout.

Added comfort with Nuheat installed in all bathrooms, kitchen, and entryway.

Professional photography of the project was provided by Angelisa Hollick.


 

The Buvette
Squamish, BC

Completion Date: 2023

Successful completion of tenant improvement project for a locally owned natural wine bar.

Installation of new lighting in dining area and kitchen.

Addition of new circuits to support operations in the kitchen and service area.

Modification of fire alarm system to align with new layout.


 

Whistler Road Chalet
Whistler, BC

General Contractor: Kits Construction
Designer: Intrepid Interiors
Project Completion Date: 2022

The renovation of a 5-bedroom chalet in Nordic included the installation of Nuheat infloor heating throughout the entire main floor, replacing the existing baseboard heat. Additionally, the lighting was upgraded to new Lotus recessed LED lighting throughout the chalet.

A new Lutron Caseta lighting control system was installed to enhance functionality and ambiance

Professional photography of the project was provided by Angelisa Hollick.


 

Tenquille Place Chalet
Pemberton, BC

General Contractor: Homeowner Design & Built
Completed: 2024

New construction project consisting of a 2 bedroom home with an additional 1 bedroom suite in Sunstone

Collaborated with the homeowner to create a custom lighting layout

Utilized Juno LED recessed lighting for energy efficiency

Installed 2x 200 Amp underground service to accommodate the property's electrical needs


 

Taluswood Mountainside Townhome
Whistler, BC

Contractor: Kits Construction
Designer: Intrepid Interiors
Project Completion: 2022

Scope of work included a comprehensive main floor renovation, encompassing the kitchen and living room areas.

New electrical circuits were installed to accommodate an instant hot water unit and garburator under the sink.

The integration of a new Lutron Caseta smart lighting control system was implemented to enhance functionality and ambiance throughout the entire unit.

To facilitate the installation of a hot tub without exceeding existing service capacity, an AC Dandy Loadmiser was utilized.

Professional photography of the project was provided by Angelisa Hollick.